Gansu Diebu Niaoujiaga, Ni’ao, China

CDM Validation Report

The Certification Body "Climate and Energy" has been ordered by Mitsui & Co. Ltd. to perform a validation of the above mentioned project. Using a risk based approach the validation of this project has been performed by document reviews and on-site inspections, audits at the locations of the project.
Read more ››

VER Monitoring Report

The purpose of this document is to report the emission reductions generated by the Gansu Diebu Niaojiaga 12.9 MW Hydropower Station Project during the following period (including the start and end days): 01/08/2006 - 13/05/2007.
Read more ››