Gansu Diebu Niaoujiaga, Ni’ao, China
CDM Validation Report
The Certification Body "Climate and Energy" has been ordered by Mitsui & Co. Ltd. to perform a validation of the above mentioned project. Using a risk based approach the validation of this project has been performed by document reviews and on-site inspections, audits at the locations of the project.
VER Monitoring Report
The purpose of this document is to report the emission reductions generated by the Gansu Diebu Niaojiaga 12.9 MW Hydropower Station Project during the following period (including the start and end days): 01/08/2006 - 13/05/2007.